Welcome to the chronoskin team wiki
One place for plans, notes and checklists. Anyone on the team can edit any page.
- 1,286
- Pages
- 74
- Edits this week
- 412
- Attachments
- 38
- People
Spaces All 9 spaces
- PLATPlatform team
- DOCHandbook
- QATest plans
- OPSOperations
Recently updated More
- LKRelease checklist 3 new10:42
- TBMeeting notes, 12 June09:15
- ARLoad test resultsYesterday
- JOOn-call rotaYesterday
- LKGlossary10 June
Space tools [show]
Export the space, set restrictions and manage labels from the administration page.
Your favourite pages
- Release checklistin progress
- On-call rotacurrent
- Architecture overviewout of date
- Rollback plannot written
Tip of the week
Release checklist
LK Added by Tomas Brandt, last edited by Lena Kowal on 13 June 2008 (view change)
Before the release
Work through this list for every release of the platform. Each step has one owner; if you cannot finish yours, say so on this page before the freeze, not after.
- Freeze the branch with
make freeze VERSION=2.4. - Run the smoke tests on the staging machines.
- Write the release notes from the change log.
After the release
Watch the error log for an hour, then close the release page and open the next one. See the rollback plan if anything goes wrong.
Links on this wiki
- Release 2.4 notes (a page)
- Release 2.3 notes (a page you have read)
- On-call rota (under the pointer)
- Architecture overview (while pressed)
- Rollback plan (a page nobody has written)
- Build server status (an outside link)
Release 2.4
- Freeze16 June
- Release19 June
- ManagerLena Kowal
- Statein progress
(!)Freeze moved. The freeze is now on Monday 16 June. See the meeting notes.
| Step | Owner | Days before release | Open issues | State |
|---|---|---|---|---|
| Freeze the branch | Tomas Brandt | 3 | 0 | done |
| Smoke tests on staging | Asha Rao | 2 | 4 | in progress |
| Release notes | Lena Kowal | 2 | 1 | in progress |
| Database migration rehearsal | Jonas Oduya | 1 | 7 | blocked |
| Announce to support | Lena Kowal | 0 | 0 | not started |
Labels: release checklist platform Edit labels
Attachments (3) Attach a file
| Name | Size | Added by | Date | Comment |
|---|---|---|---|---|
| smoke-tests.txt | 14 kB | Asha Rao | 13 June 2008 | Output of the last run |
| freeze-plan.pdf | 212 kB | Tomas Brandt | 10 June 2008 | Version 2, replaces the May plan |
| schedule.csv | 3 kB | Lena Kowal | 2 June 2008 | Dates for 2.4 and 2.5 |
Comments (3) Add comment
- AR
- JO
Jonas Oduya says:12 June 2008, 17:05
It is. I will rebuild that machine tomorrow morning and run them again.
- LK
Lena Kowal says:13 June 2008, 10:42
Added the smoke test step to the table so we stop forgetting who owns it.
Pages in Platform team
214 pages, newest change first. Showing 1 to 8.
| Page | Last changed by | Changed | Versions | Comments | Files |
|---|---|---|---|---|---|
| Release checklist | Lena Kowal | 13 June 2008 | 27 | 3 | 3 |
| Meeting notes, 12 June | Tomas Brandt | 13 June 2008 | 2 | 0 | 0 |
| On-call rota | Jonas Oduya | 12 June 2008 | 61 | 8 | 1 |
| Release 2.4 notes | Lena Kowal | 11 June 2008 | 9 | 1 | 0 |
| Architecture overview | Asha Rao | 2 March 2008 | 14 | 5 | 6 |
| Glossary | Lena Kowal | 10 June 2008 | 33 | 0 | 0 |
| How to rebuild a staging machine | Jonas Oduya | 6 June 2008 | 5 | 2 | 1 |
| Release 2.3 notes | Tomas Brandt | 21 April 2008 | 12 | 4 | 2 |
Orphaned pages
No orphaned pages
Every page in this space is linked from at least one other page. Pages nobody links to will be listed here.
Add a pageEdit page: Release checklist
Version 28, based on version 27 by Lena Kowal. Your draft was saved at 10:51.
Notation help [show]
h2. makes a heading, asterisks make bold text, and square brackets link a page.
(i)Asha Rao is also editing this page. She started 4 minutes ago. Whoever saves second will be asked to merge.
(x)The page was not saved. A page called "Release checklist 2.4" already exists in this space. Choose another title.
Notation help
- h2. Titleheading
- *bold*strong text
- * itembullet
- [Page name]link
- {note}...{note}note box
Page properties
- Space
- Platform team (PLAT)
- Created
- Tomas Brandt, 4 February 2008
- Versions
- 27, by 5 people
- Restrictions
- Anyone on the team can edit
Removing the page also removes its 3 attachments and 3 comments. It can be restored from the space's bin for 30 days.
Asha Rao says:12 June 2008, 16:20
Four smoke tests still fail on the second staging machine. I have attached the output; it looks like a stale configuration file.